Projects
Completed Projects

Construction of G + 14 Central Park Apartment at Bahria Town Karachi
Construction of G + 14 Central Park Apartment at Bahria Town Karachi

Sitara Developers (Pvt) Ltd Construction of Flyover at Sitara Green City Gatwala, Faisalabad
Sitara Developers (Pvt) Ltd Construction of Flyover at Sitara Green City Gatwala, Faisalabad

Sitara Chemicals Industries Limited Construction of Building Works upto Zero level for 50 WM
Sitara Chemicals Industries Limited Construction of Building Works upto Zero level for 50 WM Coal Fired Power Plant at SCIL, Faisalabad
Cement Industry Projects

Construction of 8400 TPD, Lucky Cement Plant (Line-F), Karachi
Construction of 8400 TPD, Lucky Cement Plant (Line-F), Karachi
- Raw Meal Blending Silo Foundation & Silo
- Cement Silos Foundation & Silos (3 Nos.)
- Clinker Silo Foundation
- Clinker Storage

Pakland Cement Project Extension Line - 2 at Dhabeji, Karachi
Pakland Cement Project Extension Line - 2 at Dhabeji, Karachi
- Civil work & steel structure work of Pre-homogenisation yard
- Raw mill, EP & CT
- Civil works and steel structure of pre-heater
- Civil works and steel structure of kiln piers
- Cooler Building EP & CT
Power Plant Projects

Construction of 150 MW, Fauji Kabirwala Power Project
Construction of 150 MW, Fauji Kabirwala Power Project
- Raw Meal Blending Silo Foundation & Silo
- Cement Silos Foundation & Silos (3 Nos.)
- Clinker Silo Foundation
- Clinker Storage

Oil Fired Thermal Power Stations Unit 2, 3 & 4, Jamshoro
Oil Fired Thermal Power Stations Unit 2, 3 & 4, Jamshoro
- Water treatment area and allied structures for each of unit 2, 3 & 4 separately.
- Water pre-treatment area for each of unit 2, 3 & 4.
- Chlorination House.
- Waste Water Treatment Area.
- Hydrogen generation plant.

Kot Addu Combined Cycle Power Plant Unit 11 & 12, Each 210MW
Kot Addu Combined Cycle Power Plant Unit 11 & 12, Each 210MW
- R.C.C. Piles 2200 Nos of 750 mm dia.
- Steam Turbine building unit 11 & 12.
- Machine Hall unit 11 & 12.
- Tanks Farm.
- Electrical & ancillary building.

47 MW Combined Cycle Power Project at Gas Turbine Power Station Faisalabad, Pakistan
47 MW Combined Cycle Power Project at Gas Turbine Power Station Faisalabad, Pakistan
- Steam Turbine Building.
- Machine Hall.
- Turbo Generator Pedestal.
- Fuel Oil tanks area.
- Electrical distribution building.
- Cooling towers.
- Cooling Water pump house.
- Cooling water pipe lines.

Construction of Synthetic Natural Gas Plant, (SNG Plant) at Bahria Town Karachi, Karachi
Construction of Synthetic Natural Gas Plant, (SNG Plant) at Bahria Town Karachi, Karachi
Ports and Harbour Projects

Reconstruction of Berths # 10 to 14 at East Wharves, Karachi for Karachi Port Trust
Reconstruction of Berths # 10 to 14 at East Wharves, Karachi for Karachi Port Trust
- 780 meter long Quay Wall comprising of
- 2 meter dia 32 meter deep bored concrete piles.
- 390 Nos. 2 meter dia Anchor Piles.
- RCC Capping Beam over front wall pile precast / Cast-in.

Integrated Liquid Chemical Terminal & Storage Tank Farm (Civil Works on Shore)
Integrated Liquid Chemical Terminal & Storage Tank Farm (Civil Works on Shore)
- Site Development
- Paraxylene Tank
- Acetic Acid Tank
- Fresh Water Tank
- Waste Water Storage Tank
- Diesel Storage Tank

LPG Storage and Bottling facility at Port Qasim SITE (Phase I).
LPG Storage and Bottling facility at Port Qasim SITE (Phase I).
The Project Comprises of the following main works and components:
- Land Reclamation / Development (10 Acres).
- Spherical Tank Foundations
- Bottling Plants
- LPG Day Tanks
- LPG Pumping Station
- Water Storage Tanks

Construction of Paradise Bridge over Langeji Nallah at Bahria Town Karachi
Construction of Paradise Bridge over Langeji Nallah at Bahria Town Karachi

Construction of BRTS Green Line, BRT Common Corridor, Underground facility at M.A. Jinnah Road,
Construction of BRTS Green Line, BRT Common Corridor, Underground facility at M.A. Jinnah Road, Contract Package # KAR/BRTS/GL/16

Green Line BRTS from KESC Power House Chowrangi, Surjani to Municipal Park, Saddar Karachi.
Green Line BRTS from KESC Power House Chowrangi, Surjani to Municipal Park, Saddar Karachi. Elevated Section from Surjani to Nagan Chowrangi.

Construction of Bridge at Avenue 17 at Bahria Town, Karachi
Construction of Bridge at Avenue 17 at Bahria Town, Karachi

Construction of Under Pass for Bahria Town Superhighway Karachi near Day Night Safari
Construction of Under Pass for Bahria Town Superhighway Karachi near Day Night Safari

Construction of Green Line Bus Rapid Transit System KESC Power House Chowrangi, Surjani to Municipal Park, Saddar Karachi.
Construction of Green Line Bus Rapid Transit System KESC Power House Chowrangi, Surjani to Municipal Park, Saddar Karachi. Segment: 1 - 2 Minute Chowrangi to Nagan Chowrangi Contract Package: KAR/BRTS/GL/04

Construction for Extension of Super Highway to Motorway (M-9) Project.
Construction for Extension of Super Highway to Motorway (M-9) Project.

Periodic Maintenance Work on N-5 Punjab – South Region.
Periodic Maintenance Work on N-5 Punjab – South Region.

Construction of 2-Lane Bridge across River Indus at Khushalgarh,
Construction of 2-Lane Bridge across River Indus at Khushalgarh, Dist Kohat & its Approach Roads Package-I. (Main Balanced Cantilever Bridge and Road Work N-80)

Construction of Sakrand – Benazirabad Road (Package –II) Km 10+000 to Km 21+390
Construction of Sakrand – Benazirabad Road (Package –II) Km 10+000 to Km 21+390

Const. of Bridge Over River Indus at Thakot. (Segmental Cantilever Bridge)
Const. of Bridge Over River Indus at Thakot. (Segmental Cantilever Bridge)
The existing suspension Bridge over the River Indus at Thakot (RD-Km 191) is one of a new major crossings over the River Indus along Karakorum Highway (N-35) in the project area.

Construction of Flyover along Kh-e-Hafiz at Gizri Commercial Area, Karachi
Construction of Flyover along Kh-e-Hafiz at Gizri Commercial Area, Karachi
Gizri Flyover is 1200 meter long, 4 Lane Bridge along Khayaban-e-Hafiz, DHA Karachi. Bridge structure comprises of Pile foundations and Pre-cast Pre-stressed Girders.

Construction of 3 Tier Flyover “KPT Interchange” at Hino Chowk Korangi Road Karachi including KPT Flyover at M.T. Khan Road.
Construction of 3 Tier Flyover “KPT Interchange” at Hino Chowk Korangi Road Karachi including KPT Flyover at M.T. Khan Road.
KPT Flyover consists of construction of bridge and allied works on Korangi Road.

K.P.T. INTERCHANGE PROJECT
K.P.T. INTERCHANGE PROJECT

Glimpses of Inaugural Ceremony
Glimpses of Inaugural Ceremony

Glimpses of KPT Flyover at M.T. Khan Road
Glimpses of KPT Flyover at M.T. Khan Road

Construction of Islamabad – Peshawar Motorway (M-1).
Construction of Islamabad – Peshawar Motorway (M-1).
Engr. Ahmed Ghazal Usmani is receiving Merit Certificate from Mr Muhammad Shamim Siddiqui, Federal Minister for Communication on the completion of M-1 (Islamabad Peshawar Motorway).

Construction of Bridge and Road Between Km 44+000 to 47+000 Near Burida Camp,
Construction of Bridge and Road Between Km 44+000 to 47+000 Near Burida Camp,
he Project Comprises of the following main works and components:
- Length of 4 Lane Bridge – 44 meters
- Pile Foundations 25 meters – 16 Nos
- Pre-stressed Girders 30 meters – 4 Nos
- 4 Lane Length of Roads – 1200 meters
- Flood Protection Works

Railway Overhead Bridge at Ghaggar Phattak on National Highway from Karachi to Thatta and its Approach Roads
Railway Overhead Bridge at Ghaggar Phattak on National Highway from Karachi to Thatta and its Approach Roads
Railway Overhead Bridge at Ghaggar Phattak on National Highway was constructed over level crossing located on main railway track between Karachi and Kotri at about Km 51.2 where the gate used to close for about 57 times (average) daily with a cumulative stoppage time of 3.73 hours.

Glimpse of Inaugural Ceremony Railway Overhead Bridge at Ghaggar Phattak
Glimpse of Inaugural Ceremony Railway Overhead Bridge at Ghaggar Phattak

Construction of Rotary Bridges No. 2 & 3, at Burhan Interchange, Islamabad – Peshawar Motorway
Construction of Rotary Bridges No. 2 & 3, at Burhan Interchange, Islamabad – Peshawar Motorway
This part of project comprises of Two numbers independent Rotary Bridges over the G.T. Road, with their up and down ramps. These bridges are located at a distance of about 1.20km apart.

Rashid Minhas Road Flyover and Allied Works
Rashid Minhas Road Flyover and Allied Works

Sitara Developers (Pvt) Ltd Construction of Flyover at Sitara Green City Gatwala, Faisalabad
Sitara Developers (Pvt) Ltd Construction of Flyover at Sitara Green City Gatwala, Faisalabad
Building Projects

Construction of Building Works upto Zero level for 50 WM Coal Fired Power Plant at SCIL, Faisalabad
Construction of Building Works upto Zero level for 50 WM Coal Fired Power Plant at SCIL, Faisalabad

Construction of G + 4 (10 Towers) Bahria Green Apartment at Bahria Town Karachi (Grey Structure)
Construction of G + 4 (10 Towers) Bahria Green Apartment at Bahria Town Karachi (Grey Structure)

Development Works of Bholari Residential Area Contract Package (BRAC-05).
Development Works of Bholari Residential Area Contract Package (BRAC-05).

Construction of ACE Auditorium at PAF Base Mushaf Sargodha
Construction of ACE Auditorium at PAF Base Mushaf Sargodha

Package-I Civil / Electrical / Plumbing Works & Local Area Networking) for Regional Taxpayers Office Karachi
Package-I Civil / Electrical / Plumbing Works & Local Area Networking) for Regional Taxpayers Office Karachi for Central Board of Revenue

Construction of Office Building of Ministry of Science & Technology at Constitution Avenue, Islamabad
Construction of Office Building of Ministry of Science & Technology at Constitution Avenue, Islamabad

Central Board of Revenue Building
Central Board of Revenue Building

Construction of G + 14 Central Park Apartment at Bahria Town Karachi
Construction of G + 14 Central Park Apartment at Bahria Town Karachi
Drainage Projects

Up gradation of Bholari Drainage System (Package: UBDS) at PAF Base Bholari
Up gradation of Bholari Drainage System (Package: UBDS) at PAF Base Bholari
Sewerage Treatment Plant
Projects in Progress

Improvement, Widening and Construction of North Access Road
Improvement, Widening and Construction of North Access Road (Package-II) from Baradam to Ashriat (Km 3+520 to Km 10+850.74) – 7.330 Km of Lowari Tunnel Project.

Bholari Project: Package: Bholari Residential Area Construction-10
Bholari Project: Package: Bholari Residential Area Construction-10

Construction of Road Connectivity Bridge between East and West Wharf at Karachi Port
Construction of Road Connectivity Bridge between East and West Wharf at Karachi Port
